Office building ALLEGRA

Office building ALLEGRA

Luxembourg

Construction of an administrative building in Leudelange. The project, located in the commercial area, consists of two staggered volumes connected by a central circulation line. Overhangs allow for covered outdoor terraces for the building’s users. The office building has 4 above-ground levels and 3 underground floors. The floor plans are open, allowing flexible and variable office modulation according to the users’ wishes. 

The most important figures:

  • 5,500m² area
  • Opening date: 2022

Central power supply systems, emergency and safety lighting from the RP Group were installed throughout the entire building complex . In total, over 300 RP products were installed: 

PHOTO GALLERY